Customization: | Available |
---|---|
After-sales Service: | Dispatched Engineer or Online Installation Guide |
Characteristics Of Goods: | Finished Goods Warehouse |
Still deciding? Get samples of US$ 50/Square Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Main Steel Frame | H section steel | Q235/Q355 steel |
Welding | Automatic submerged arc welding | |
Rust removal | Sand blasting | |
Surface finish | Alkyd paint or galvanized | |
Intensive bolt | M20,Grade 10.9 | |
Supporting System | Angle brace | L50x4,Steel Q235, processed and painted |
Horizontal brace | Φ25, Steel Q235, processed and painted | |
Column brance | Φ25, Steel Q235, processed and painted | |
Tie rod | Φ114*4, Steel Q235, processed and painted | |
Ordinary bolt | M12 Galvanized bolt | |
Roof | Purlin | C180*75*20*2.5,Steel Q235, galvanized and painted |
Roof panel | Sandwich panel or corrugated steel sheet | |
Sky light | 6mm thick PVC | |
Accessories | Glass cement, self-tapping screws, etc. | |
Edge cover | 0.5mm steel sheet profile trimming | |
Gutter | 0.5mm thick sheet steel profile or galvanized sheet | |
Down pie | Φ150PVC | |
Walls | Purlin | C160*60*2.5, Steel Q235, painted |
Wall | Sandwich panel or corrugated steel plate | |
Accessories | Glass cement, self-tapping screws, etc. | |
Edge cover | 0.4mm steel sheet profile trimming | |
Ventilation | Ventilation ball | |
Doors & windows | Rolling door/sliding door PVC/alu/steel/window |
Introduction of Prefab Steel Structure Building
1. Light-weightness and more resistance to earthquakes and strong winds.
2. Sustainability and less lifecycle cost thanks to low maintenance costs and highest quality materials, such as galvanized steel.
3. Shorter construction period with the help of modularity and error-free prefabrication of building elements.
4. Environment-friendly thanks to reusable steel members and minimized wastes by efficient usage of materials in the factory.
5. Functionality, provided by relocatable, replaceable and load carrying walls and efficient usage of the space.
Quality control system
· Purchase material from famous steel manufacturer, supply traceable mill certificate.
· Before we use the material, we will make a third-party inspection,
· During fabricating, we have 5 QC to inspect every piece member.
· Before we load the steel into the container, we will arrange all the managers to check the steel member.
· Project Supervisor from customer will be welcomed during our fabrication.
· Pre-assembly will be available to check the quality and connection.
1. To provide product installation drawings and video, if you have special requirements, we also have engineers to guide the installation.
It is very easy to assemble and disassemble, you can install the house just like playing the Block Game. One worker can assemble 40-50 square meters in 8 hours, also you can build the house just follow our video.
2. If have any problems, we will promptly give a reasonable solution 24 hours.
Packing and Loading
1.The primary and secondary steel are packaged as a whole;
2.The accompanying items are packed in boxes;
3.The roof, wall panels and accessories are packed in bulk;
4.Each part of all items is printed with an independent number, which is convenient for customers to install and use;
5.Adopt the most reasonable packing scheme to ensure the maximum use of the container's space load.
1. Communicate design requirements 2. Design the architectural scheme
3. The customer confirms the drawing 4. Give the quotation
5. Factory production materials 6. Product quality inspection
7. Product packaging 8. Shipment
We have varied shapes and sizes of steel structure warehouse for sale. If you are thinking about building your own warehouses, the steel construction warehouse will be the most economical solution for you.
The shape, size, chemical composition and strength of our structural steel is made in strict accordance with industrial standards and regulations.
The steels are sourced from reputable suppliers, and each steel warehouse building can be tailored to fit the needs of customers regarding their specific projects and requirements.
Reply information, get a quote | ||
1 | Is there a design? | If not, answer the following questions, designed for you |
2 | The location | |
3 | Purpose of construction | workshop/warehouse/factory/other |
4 | Size | _____(m)L*_____(m)W*_____(m)H |
5 | Crane | _____(h) Maximum daily working time _____(t) Lifting capacity _____(m) Operating height |
6 | Wind load/Maximum wind speed (In the last 50 years) | _____(KN/m2) / _____(km/h) |
7 | Snow load/Maximum snowfall (In the last 50 years) | _____(KN/m2)/ _____(mm/24h) |
8 | Seismic grade | _____level |
9 | Whether or not near the sea | |
10 | Door/Window | Quantity: _____(unit) Size: ____(m)L*_____(m)W*_____(m)H |
11 | Roof/Wall panels | Quantity: Single/double layer Material: Foam/rockwool/polyurethane sandwich board Thickness: according to customer's requirement |
12 | Thermal insulation | According to customer's requirement |
13 | Daylighting | Daylighting belt/Daylighting tube/Fixed window |
14 | Ventilation | Roof ventilation/Point ventilation/Turbine ventilation |
15 | Brick wall | 1.2M is recommended if there is no special requirement. |
16 | Other | Materials that are not allowed to be imported into the country |