1. Easy to assemble.
The steel components arriving at the construction site are all prefabricated. During the construction process, the installation work needs to layout each structure and erect it according to the installation drawing.
The installation sequence of the steel workshop building is:
First, install the steel columns and column cross-bracing and install roof beams and roof horizontal bracing. Finally, installs the purlin and enclosure structure.
2. Reasonable cost.
The steel structure workshop building is light in weight, reducing the basic cost, and the construction speed is fast. It can be completed and put into production as soon as possible. The overall economic benefits are much better than that of the concrete structure
3. Simple construction, short construction period.
The production and installation of steel structure usually involve processing all required components in the factory and then transporting to the construction site to assemble. So the construction period is greatly shortened. A 4000 square meter building can be basically installed in only 40 days.
4. Energy-saving and environmentally friendly.
The corrugated color steel sheet and sandwich panels used in the prefab steel structure workshop are all energy-saving materials. The steel structure also adopts dry construction during the construction process to avoid dust and environmental pollution caused by concrete construction.
Design Details
Main Parts |
Item Name |
Specification |
Main Steel Frame |
Steel Column |
Q235B, Q355B H shape, Box, Steel pipe, Hot rolled sheet |
Steel Beam |
Q235B, Q355B H shape, Steel Truss, Hot rolled sheet |
|
Supporting System |
Brace |
Q235B, Q355B Steel rod, Steel pipe, Angle steel |
Roof Purlin |
C or Z shape, Steel purlin |
|
Wall Purlin |
Q235B, Q355B C or Z shape, Steel purlin |
|
Roof |
Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc. |
|
Wall |
Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc. |
|
Accessories |
Bolts |
Ordinary, High Strength |
Gutter |
Galvanized Steel plate, Stainless steel |
|
Windows |
Aluminum alloy-Glass, Aluminum alloy-shutter, PVC |
|
Doors |
Sliding or Rolling door |
|
Downpipes |
PVC pipe, Color steel pipe |
|
Edge Cover |
Made of color steel sheet thickness 0.5mm |
|
Ventilator |
Stainless steel |
|
Crane |
Crane in 5 tons to 20 tons |
The portal steel frame's particular nodes include the column foot node, beam, column-to-beam node, roof beam node, column and roof bracing, tie beam connection node, and gutter bracket.
DRYC is a comprehensive enterprise which integrates design, production, processing, logistics, transportation and construction in the steel structure construction industry. It has 6 production lines of various types of steel structures and plates, covering the production and processing of all materials in the steel structure construction industry. And has obtained I-S-O international quality management system certification, steel structure, color steel plate, integrated housing C-E certificatio.
Transportation & Packaging
1. We use 4O"HQ container, This way we loading and unloading is very slow and diffcult. But this way is the lowest cost.
2. We use 40" OT container, we can load all members easily. and good way to protect the possible damage during shipping. But that will cost more ocea freight.
3. We still use 40" HQ, but we could make a steel pallet to put all members on it. And then we push it into the container, this way is the fastest way to loading and unloading, and we can make the pakage to project any damage during shipping. But the steel pallet will cost about 800 usd per pc.
We offer comprehensive technical support and service for steel structure workshop. Our professional technical team will provide detailed guidance in installation, debugging, commissioning and operation of the workshop. We also provide regular maintenance and repair services, as well as professional advice and assistance in the event of any technical problems.
We are committed to providing our customers with quality products and reliable services. Our experienced technical team will respond quickly to your inquiries and provide timely solutions to any technical issues you may have. Our dedicated service team will provide you with detailed information and quick response in case of any emergency.
We also provide comprehensive after-sales service to ensure your satisfaction. Our professional technicians are available 24 hours a day, 7 days a week, to provide you with timely and effective solutions. We also offer regular maintenance and repair services, as well as on-site inspection and maintenance.
Reply information, get a quote | ||
1 | Is there a design? | If not, answer the following questions, designed for you |
2 | The location | |
3 | Purpose of construction | workshop/warehouse/factory/other |
4 | Size | _____(m)L*_____(m)W*_____(m)H |
5 | Crane | _____(h) Maximum daily working time _____(t) Lifting capacity _____(m) Operating height |
6 | Wind load/Maximum wind speed (In the last 50 years) | _____(KN/m2) / _____(km/h) |
7 | Snow load/Maximum snowfall (In the last 50 years) | _____(KN/m2)/ _____(mm/24h) |
8 | Seismic grade | _____level |
9 | Whether or not near the sea | |
10 | Door/Window | Quantity: _____(unit) Size: ____(m)L*_____(m)W*_____(m)H |
11 | Roof/Wall panels | Quantity: Single/double layer Material: Foam/rockwool/polyurethane sandwich board Thickness: according to customer's requirement |
12 | Thermal insulation | According to customer's requirement |
13 | Daylighting | Daylighting belt/Daylighting tube/Fixed window |
14 | Ventilation | Roof ventilation/Point ventilation/Turbine ventilation |
15 | Brick wall | 1.2M is recommended if there is no special requirement. |
16 | Other | Materials that are not allowed to be imported into the country |