• Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel
  • Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel
  • Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel
  • Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel
  • Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel
  • Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel

Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel

After-sales Service: Installation Instruction in Drawings or Videos
Connection Form: Bolt Connection
Construction Member: Steel Structure Frame
Grade: Carbon Structural Steel
Molding Method: Hot-Roled Steel, Cold Drawn Steel
Residential Wall Structure: Wall Girt
Customization:
Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
DRYCZD10
Standard
GB, ASTM, DIN, JIS, AISI, BS
Steel Type
Carbon Steel
Structure
Frame Structure
Size
Customized
Design Parameter
Wind Load, Snow Load, Earthquake Grade
Main Frame
Welded Column, Beam
Surface Treatment
Galvanized and Painting as Customer′s Request
Wall and Roof System
Insulation Sandwich Panel or Customized
Door and Window
as Per Customer′s Request
Brick Wall
as Per Customer′s Request
Color
Red, Blue, White, or Customized
Service Life
More Than 50 Years
Service
One-Stop Service
Application
Steel Workshop, Steel Structure Platform
Member
Steel Column and Beam
Type
Steel Structure Frame
Forming
Welded, Cold Drawn, Hot Rolled
Warranty
1year
Transport Package
Sea Worthy Pacage for Steel Structure
Specification
Customized
Trademark
Dryc
Origin
Qingdao, China
HS Code
73089000
Production Capacity
50000 Metric Tons a Year

Product Description


 
Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel



Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel
Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel

Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel
Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel

Main materials and opptions are as the following:
Load: Dead load 0.25, Live load 0.3, Wind load: 0.35, Snow Load: 0.5
NO. Item Note
A: Main steel frame
1 Column Welded H column, Q345B, two coats of paint
2 Beam Welded H beam, Q345B, two coats of paint
3 Roof purlin Z180*80*20*2.5/2.0, Q235B, Galvanized
4 Steel Floor Deck V688*0.8mm
5 Column bracing D20, two coats of paint 
6 Roof bracing D20, two coats of paint 
7 Tie bar D120 * 2.5, two coats of paint 
8 Anti-sag bar D12,  Galvanized
9 Anchor bolt M24
B: Standard parts 
1 High strength bolt M20*75(10.9S)
2 Common bolt M12*35, M16*50(4.8S)
3 Nut M12, M24, M20 * Galvanized
C: Windows and door
1 Door Roll-up door, steel door, access door, etc, Customized
2 Window PVC or Aluminum frame, Fixed, swing, sliding, louver etc, size customized
3 Complementary material  

Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/HotelMulti Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel

      Established in 2014, Dingrui Yongcheng Construction Engineering Company is a comprehensive construction company specialising in the design, production and installation of new prefabricated steel structures. With a wide range of product types, we can undertake a variety of projects such as portal frames, multi-storey frames, large-span net frames, farms, light steel villas, container houses and so on.

      The company has CE, GB/T19001-2016/IS09001:2015GB/T50430-2017 quality management system certification, the national housing construction project construction general contracting grade two, steel structure engineering professional contracting grade two and other qualifications, for the company to improve the quality of the project, honesty in the market, and service to the customer, to make a guarantee and commitment.

      Dingrui Yongcheng owns the domestic advanced intelligent automatic new building materials processing production line, which can independently complete a series of processes such as steel cutting, transmission, assembly, turning, welding, correction, etc., and truly realizes the full-automatic process operation of production industrialization and operation mechanization, with an annual output of more than 30,000 tonnes of new building materials.

      DRYC advances with the times, constantly adapting to market demand, with a group of experienced design team and a number of skilled installation team, with excellent quality of service, professional and safe equipment and technical strength, to provide users with higher and better quality of service.

      In the future, DRYC will continue to uphold the "quality first" principle, with pioneering enterprise style, pragmatic and efficient entrepreneurial spirit, to provide customers with high-quality one-stop solutions.


CERTIFICATES
Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel
OUR TEAM
Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel

WORKSHOP
Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel
ADVANCED EQUIPMENT
Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel
PRODUCTION PROCESS
Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel
STRICT QUALITY CONTROL

Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel
PACKING AND LOADING
Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel

PROJECT SHOWROOM

Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel
Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel
Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel

Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel
Q: Is your company a factory or a trader?
A: We are a company integrating industry and trade. You are welcomed to visiting our factory. 
The quality control flow and sales team will show you our professionalism.

Q: Whats the quality assurance you provided and how do you control quality?
A: 
There is a procedure to check products at all stages of the manufacturing process - raw materials, in process materials, validated or tested materials, finished goods, etc. SGS, BV and other testing are available for us.

Q: Can you offer designing service?
A: Yes, we have more than 20 experienced designers. We could design full solution drawings as per your requirements.
By using AutoCAD, PKPM, MTS, 3D3S, Tekla Structures (X steel) etc, we can design complex industrial building like office mansion, super market, plants, shipping mall, 5 stars hotel, etc. One-stop service is our outstanding superiority.

Q: How about the delivery time?
A: The specific production time depends on the quantity of goods. Normally, it is about 10 to 30 days after all the details are confirmed and
 receiving the deposit. The delivery of Large order should be discussed with the management department in advance and then confirm the timing with you accordingly. Usually, large order will be delivered in batches.

Q: What about the installation instrucions?
A: We will provide you
installation videos and detailed installation instructions or online technical guidance. If you need, we can provide the service of installation guidance arrange a team to do the installation on site by extra. 

Q: How about the payment?
A: All payment methods are acceptable. We prefer to 30% down payment by T/T, 70% balance before shipment.
 
Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel

If  you have the design drawing, we could make the budget according to your design.
If you could advise the following parameters so that we could make the design and quotation accordingly.

 1. Location (where will be built? ) _____  country, area
 2. Size:  _____  mm(L) * _____mm(W) * _____mm(H)
 3. Live load on roof _____  kn/m2
 4. Wind load (max. Wind speed)  _____  kn/m2, or _____km/h, or_____m/s
 5. Snow load (max. Snow height)  _____  kn/m2, or _____mm 
 6. Anti-earthquake  _____  level
 7. usage of the building:  
 8. Brickwall  needed or not if yes, 1.2m high or 1.5m high
 9.  Thermal insulation if yes, EPS, fiberglass wool, rockwool, PU sandwich panels, Corrugated steel sheet with fiber glass wool will be suggested;
If not, the Corrugated steel sheet will be ok. The cost of the latter will be much lower than that of the former.
 10. Door quantity & size _____ units, _____(width)mm*_____(height)mm
 11. Window quanity & size  _____ units, _____(width)mm*_____(height)mm
 12. Crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m
 13. Others  Skylight belt, ventilator and any other accessories if needed.

If you have any enquiry, please feel free to contact me. I have over 20 years of trading experience in many markets, such as America, EU, Mideast, Africa, Southeast Asia, Rusia. I will do my best to help you achieve the optimal solutions for your projects, thank you.

DESIGN

Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel
OUR EXPERIENCED DESIGNER AND ENGINEER TEAM

EXHIBITION
Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel
CUSTOMERS' VISITING
Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel
WIN-WIN COOPERATION
Multi Story Frame Structure Prefabricated Steel Structure Building Apartment/ Office/Housing/Hotel



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now