Advantages of Dingrui Yongcheng container house:
1. Activity: removable and reusable.
2. Rapid assembly: short manufacturing period and no foundation.
3. Steel-reinforced structure, safety, windproof and shockproof.
4. Durability: the outer wall of the steel plate is corrosion-resistant and acid-resistant and does not rust or crack, and its service life is more than 20 years.
5. Sound and heat insulation: It adopts an air-heat insulation design, with good sound and heat insulation.
6. Aesthetics: It can be designed in various shapes, with many colors on the outer wall, and a bright and beautiful appearance.
7. Low cost, high quality, and low price.
Product Display
Product Parameter
Bottom |
Frame structure |
Main frame 2.3mm (2.3mm after Baking Paint) |
Floor |
18mmThick,1164*2820mm Cement Slab |
Floor finishes |
1.0mm Floor Leather |
Roof |
Frame structure |
2.3mm thick profiled steel |
Flat suspended ceiling |
Color |
White/Customizable |
Wall panel |
Sandwich panel with 50mm rock wool |
Window |
930*1100mm Single Glass Double Push Anti-theft Plastic Steel Window With Screen Window (50 Frame) |
Door |
970mm*1970mm Steel door |
Electricity |
Light, Switch, Socket, distribution box, breaker, and wire |
Use |
Carport, Hotel, House, Kiosk, Booth, Office, Sentry Box, Guard House, Shop, Toilet, Villa, Warehouse, Workshop, Plant |
Painting |
Automatic galvanizing and baking paint spray molding |
Exterior size |
5990(L)*2990(W)*2870(H)mm |
Quick Installation
Multiple Uses
This folding container house can be folded repeatedly, recycled, in line with emergency living standards.
It is widely used for labor camp, office, dormitories, and storeroom.
We have shipped prefab houses to more than 60 countries. Australia, New Zealand, the United States, Canada, France, Sweden, Qatar,Peru, Brazil, Malaysia, Philippines, India and other countries. We also often provide container houses for the Chinese government.
About Us
Dingrui Yongcheng Steel Structure Co., Ltd. was established in 2014, integrating the design, manufacture and installation of steel structures.
Our factory covers an area of more than 30,000 square meters, with a workshop area of 20,000 square meters. In the factory, there are 6 advanced production lines of H-beam, which can process up to 2,500 tons of new building materials per month. We also have the most advanced new-type building material equipment and intelligent new-type building material processing line in China. This intelligent production line can independently complete a series of processes such as straight strip division, transmission, assembly, welding, flipping, and straightening of steel, and truly realize production automation and mechanization.
Our company has the Grade 2 of Steel structure engineering professional contracting and the Grade 2 of general contracting on construction engineering;and has passed ISO 9001, ISO 45001, and ISO 14001 quality system certification.
FAQ
1. Do you provide on-site installation service?
We provide very detailed installation instruction drawings and videos for every project. Ensure smooth installation for customers
For large projects, we will have both installation workers and supervisors on site. The fee for the on-site service should be negotiated with clients.
2. Could you please design a new and unique prefab house for me?
Absolutely! We are able to provide you with not only a construction scheme but landscape design! One-stop service is our outstanding superiority with no doubt.
3. What's your delivery time?
Normally, delivery time is 15 days after the deposit is received. For large orders, the delivery time should be negotiated.
4. How to control the quality of your product?
First, quality of the design: think about possible problems in advance and provide a high-quality design solution.
Second, quality of the raw material: choose the qualified raw material.
Third. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.
5. How to deal with quality problems?
The warranty is 2 years. Within the warranty period, Suzhou Zhongnan will responsible for all quality problems caused by our production.
6. How Long does it take to build a light steel prefab house?
It depends on the size of the house. Generally, one 50 square meter house five workers 1-3days finished installation, saving manpower and time.
7. What designs do you have in different climates (How can the products adapt to different climates)?
Strong wind region: improve the wind-resisting ability of the internal structure.
Cold region: increase the thickness of the wall, or use good insulation material, to improve the anti-pressure ability of the structure.
High corrosion region: use corrosion-resistant material, or paint anticorrosive coating.