• Multi Spans Steel Frame Prefab Metal Structure Workshop
  • Multi Spans Steel Frame Prefab Metal Structure Workshop
  • Multi Spans Steel Frame Prefab Metal Structure Workshop
  • Multi Spans Steel Frame Prefab Metal Structure Workshop
  • Multi Spans Steel Frame Prefab Metal Structure Workshop
  • Multi Spans Steel Frame Prefab Metal Structure Workshop

Multi Spans Steel Frame Prefab Metal Structure Workshop

Type: H-Section Steel
Standard: GB, ASTM, DIN, JIS, AISI, BS
Trademark: Carbon Structural Steel, DRYC
Forming: Hot-Rolled Steel
Connection Form: Bolt Connection
Member: Steel Column
Samples:
US$ 40/Square Meter 1 Square Meter(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
DRYC21
Type of Steel For Building Structure
H-Section Steel
Residential Wall Structure
Wall Support
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
After-sales Service
Dispatched Engineer or Online Installation Guide
Warranty
1 Year
Carbon Structural Steel
Q235/Q355
Transport Package
Naked Packing
Specification
Customized
Origin
Qingdao
HS Code
7308900000
Production Capacity
30, 000 Tons a Year

Product Description


Multi Spans Steel Frame Prefab Metal Structure Workshop
 

Main Parts

Item Name

Specification

Main Steel Frame

Steel Column

                         Q235B, Q355B                        

H shape, Box, Steel pipe, Hot rolled sheet

Steel Beam

                Q235B, Q355B                

H shape, Steel Truss, Hot rolled sheet

Supporting System

Brace

           Q235B, Q355B            

Steel rod, Steel pipe, Angle steel

Roof Purlin

 C or Z shape, Steel purlin

Wall Purlin

Q235B, Q355B
C or Z shape, Steel purlin

Roof

Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc.

Wall

Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc.

Accessories

Bolts

Ordinary, High strength

Gutter

Galvanized Steel plate, Stainless steel

Windows

Aluminum alloy-Glass, Aluminum alloy-shutter, PVC

Doors

Sliding or Rolling door

Downpipes

PVC pipe, Color steel pipe

Edge Cover

Made of color steel sheet thickness 0.5mm

Ventilator

Stainless steel

Crane

Crane in 5 tons to 20 tons

 

Why choose steel structure buildings?

1. High construction efficiency:

All components are prefabricated in the factory, and the construction site only requires simple assembly, making the construction process relatively safe.

2. Cost savings:

Steel structures are the cost leaders in materials and design for most projects. Its manufacturing and installation costs are low, and it requires less maintenance compared to other traditional building methods.

3. Nice Durability:

Steel structures have good seismic resistance, wind resistance, corrosion resistance, and long service life.

4. Space utilization:

Compared with concrete structures, steel structures can increase the usable area by approximately 6%.

5. Environmentally friendly:

Steel is the material with the highest recycling rate in the world, with an annual recycling capacity of 65 million tons per year, effectively reducing environmental pollution caused by the production of building materials.

Multi Spans Steel Frame Prefab Metal Structure Workshop

Production process

Multi Spans Steel Frame Prefab Metal Structure Workshop
Advanced machine

Multi Spans Steel Frame Prefab Metal Structure Workshop

Hot Products

Multi Spans Steel Frame Prefab Metal Structure Workshop

Company Profile

Multi Spans Steel Frame Prefab Metal Structure Workshop
Multi Spans Steel Frame Prefab Metal Structure Workshop
Multi Spans Steel Frame Prefab Metal Structure Workshop
     
       
Dingrui Yongcheng Steel Structure Co., Ltd. was established in 2014, integrating the design, manufacture and installation of steel structures. Our factory covers an area of more than 30,000 square meters, with a workshop area of 20,000 square meters. In the factory, there are 6 advanced production lines of H-beam, which can process up to 2,500 tons of new building materials per month. We also have the most advanced new-type building material equipment and intelligent new-type building material processing line in China. This intelligent production line can independently complete a series of processes such as straight strip division, transmission, assembly, welding, flipping, and straightening of steel, and truly realize production automation and mechanization.

FAQ

Q1. You are manufacture factory or trading company?
We are manufacture factory. And you are welcomed to visit us at any time for inspection. The quality control flow and sales team will show you our professionalism. Also, you will get best and most competitive price after visiting us.

Q2. What the quality assurance you provided and how do you control quality
Established a procedure to check products at all stages of the manufacturing process-raw materials, in process materials, validated or tested materials, finished goods, etc. SGS, BV and other testing are available for us.

Q3. Is your price competitive compared with other companies?
Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.

Q4. Do you offer designing service for us?
Absolutely, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) etc., we can design complex industrial building like office mansion, super market, auto dealer shop, shipping mall, 5 stars hotel. One-stop service is our outstanding superiority with no doubt.

Q5. What's your delivery time?
Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receiving deposit. Large order delivery time should be arranged separately.

Q6.How can I pa for my order?
30% down payment by TT,70% balance is paid by TT before shipment.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Registered Capital
1.48 Million USD
Plant Area
30220 square meters