• Q235B, Q355b Grade Fast Installed EPS/PU Sandwich Panel Steel Structure Warehouse
  • Q235B, Q355b Grade Fast Installed EPS/PU Sandwich Panel Steel Structure Warehouse
  • Q235B, Q355b Grade Fast Installed EPS/PU Sandwich Panel Steel Structure Warehouse
  • Q235B, Q355b Grade Fast Installed EPS/PU Sandwich Panel Steel Structure Warehouse
  • Q235B, Q355b Grade Fast Installed EPS/PU Sandwich Panel Steel Structure Warehouse
  • Q235B, Q355b Grade Fast Installed EPS/PU Sandwich Panel Steel Structure Warehouse

Q235B, Q355b Grade Fast Installed EPS/PU Sandwich Panel Steel Structure Warehouse

Type: Light Section Steel
Service Life: More Than 25 Years
Materials: Sandwich Board, Steel
Design Style: Modern
Purlin: C/Z Galvanized Steel (Q235, Q355)
Wall: Sandwich Board/Color Steel Plate
Samples:
US$ 20/Square Meter 1 Square Meter(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
DRYC300-C07
Roof
Sandwich Board/Color Steel Plate
Windows
Aluminum Alloy or PVC
Door
Rolling Shutter Door
Standard
GB, ASTM, DIN, JIS, AISI, BS
Trademark
Carbon Structural Steel, DRYC
Forming
Hot-Rolled Steel
Connection Form
Bolt Connection
Member
Steel Column
Type of Steel For Building Structure
H-Section Steel
Residential Wall Structure
Wall Support
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
After-sales Service
Online Installation Guide or Dispatched Engineer
Warranty
1 Year
Carbon Structural Steel
Q235B/Q355b
Transport Package
Standard Packing
Specification
Customized
Origin
Qingdao
HS Code
73089000
Production Capacity
30, 000 Tons a Year

Product Description

Q235B, Q355b Grade Fast Installed EPS/PU Sandwich Panel Steel Structure Warehouse
 
Structur   Part Part Specification
Main Steel Frame Frame Column and beam Q235B, Q355B
End-wall column Q235B, Q355B
Process Welding Automatic submerged arc welding
Rust removal Sandblasting
Surface finish Alkyd paint or galvanized
Intensive bolt M20-M30,Grade 10.9s
Supporting Sys Angle bracing
Roof bracing
X-bracing between columns
Tie rod
Roof bar 
Purlin
Angle iron L50x5
φ20,φ25Round Steel
φ20,φ25Round Steel
φ12,Round Steel
32 mm diameter Steel Pipe 
C/Z100-300, Q235,galvanized
Roof Sys Roofing material
Skylight
 panel 
Gutter
PVC
  downspout
0.4-0.6mm steel plateService life 20 years
1.5mm V840/N760 
Galvanized sheet or Stainless steel 
150,160
Wall Sys Wall material 
Door
Window
0.5mm,0.6mm  steel plateService life 20 years
Electric rolling door
Aluminum alloy or plastic steel window
Others Crane
Steel platform
Parapet (wall)
Can be customized
Can be customized
Can be customized


Design Capability

Q235B, Q355b Grade Fast Installed EPS/PU Sandwich Panel Steel Structure Warehouse

Five Points Should Be Paid Attention To In The Design Of Steel Structure Workshop:

1. Thermal Insulation and Fire Prevention of Steel
  Steel has high thermal conductivity, and its thermal conductivity is 50w (m.ºC), so when the ambient temperature of the steel structure reaches above 150ºC, it must be designed for heat insulation and fire protection.
2. Roof Support System and Roof Design
  At present, there are two commonly used steel structure roofing methods on the market: Rigid roof: double-layer color profiled steel plate with insulation cotton; Composite flexible roof: composed of roof color steel plate inner panel, gas barrier layer, insulation layer, coil Material waterproof layer.
3. Setting of Temperature Expansion Joint
  The temperature change will cause the deformation of the steel structure factory building, which will cause the structure to produce temperature stress. When the plane scale of the factory building is large, in order to avoid large temperature stress, temperature expansion joints should be set in the vertical and horizontal directions of the factory building. 
4. Anti-rust Treatment
  The surface of the steel structure will corrode when exposed directly to the atmosphere. Generally, anti-corrosion primers and topcoats are often used for the anticorrosion of steel structures, and the number and thickness of coating layers are often determined according to their use environment and coating properties.
5. Facade Design
  The facade of the steel structure factory building is mainly determined by the process layout. Under the requirements of the process, the facade is concise and magnificent, while the nodes are as simple and unified as possible. 



Building Material

Q235B, Q355b Grade Fast Installed EPS/PU Sandwich Panel Steel Structure Warehouse
Product Production

Q235B, Q355b Grade Fast Installed EPS/PU Sandwich Panel Steel Structure Warehouse
Project Cases

Q235B, Q355b Grade Fast Installed EPS/PU Sandwich Panel Steel Structure Warehouse
Q235B, Q355b Grade Fast Installed EPS/PU Sandwich Panel Steel Structure Warehouse
Company Profile



Q235B, Q355b Grade Fast Installed EPS/PU Sandwich Panel Steel Structure Warehouse
Q235B, Q355b Grade Fast Installed EPS/PU Sandwich Panel Steel Structure Warehouse
Q235B, Q355b Grade Fast Installed EPS/PU Sandwich Panel Steel Structure Warehouse

 

Contact us for a quote

Do you have design drawings? If not, answer the following questions, designed for you
Location  (Specific city)  
Application  
Size _____(m)L*_____(m)W*_____(m)H
Crane _____(h) Maximum daily working time
_____(t) Lifting capacity
_____(m) Operating height
Maximum wind speed _____km/h (Indicate the judging criteria)
Maximum snowfall _____mm/24h (Indicate the judging criteria)
Magnitude of earthquake _____Level
Is it built near the sea?  
Door and Window Quantity: _____(unit)
Size: ____(m)L*_____(m)W*_____(m)H
Roof and Wall panels Quantity: Single/double layer
Material: Foam/Rockwool/Polyurethane sandwich board
Thickness: According to customer's requirement
Thermal Insulation According to customer's requirement
Lighting Mode Daylighting belt/Daylighting tube/Fixed window
Ventilation Roof ventilation/Point ventilation/Turbine ventilation
Brick Wall 1.2m/1.5m/other
Other Materials that are not allowed to be imported into the country

Q&A
1. How long does it take to build a steel structure?
  Since the main products of the factory structural parts have been prefabricated in the factory, the production cycle is less than 30 days and then shipped to the site for installation. Installation times usually depend on the size of the plant and the number of workers needed.

2. Will installation services be provided?
  We will provide detailed installation drawings and 3D structure drawings for reference before the goods arrive at the destination. Online support will also be available. If an engineer or installation team is required, the cost will need to be negotiated.

3. Can the steel structure be relocated twice?
  The modular, prefabricated and lightweight features of our structures ensure their durability but ease of relocation. The structure can be disassembled and reassembled on a new site without any complications.

4. Do you offer design?
  Our company has more than ten years of professional structural engineers and designers, can comprehensively consider your needs and the environment of the region, for each component of strict one-to-one calculation. Make sure every design is done on a secure basis and saves you money.

5. Is your house custom-built?
  Our control over all aspects of the building ensures that we can customise the structure to meet your needs and wishes. Therefore, we can customize all aspects, including model, design, manufacturing; As a result, our high quality steel construction is customizable.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Registered Capital
1.48 Million USD
Plant Area
30220 square meters