Customization: | Available |
---|---|
Connection Form: | Bolt Connection |
Service Life: | More Than 50 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Main Steel Frame System | |
Main structure | H section steel Q355, alkyd painting, two primary painting, two finish painting. |
Roof purlin | XZ160*60*20*2.5, galvanized |
Wall purlin | XZ160*60*20*2.5, galvanized |
Intensive bolt | Grade 10.9 |
Turn buckle bolt | M20+2, steel Q235, processing |
Anchor bolt | M24, steel Q235, processing |
Ordinary bolt | Galvanized bolt M20 |
Ordinary bolt | Galvanized bolt M12 |
Brace nut | Galvanized bolt M12 |
Bracing System | |
Cross brace | Φ20 round steel bar Q235, process and painted (alkyd painting) |
Angle brace | L50*5 angle steel Q235, process and painted (alkyd painting) |
Column bracing | Φ25 round steel bar Q235, process and painted (alkyd painting) |
Tie bar | Φ127*3 steel pipe Q235, process and painted (alkyd painting) |
Batter brace | Φ32*2.5, Φ12 round steel bar Q235, process and painted (alkyd painting) |
Wall & Roof System | |
Roof panel | Corrugated steel plate or sandwich panel (EPS/fiber glass/rock wool/PU) |
Wall panel | Corrugated steel plate or sandwich panel (EPS/fiber glass/rock wool/PU) |
Edge cover | 0.5mm color plate, angle Alu. |
Fittings & accessories | Nails, glue etc. |
Unpowered ventilator | Diameter Φ600, stainless steel |
Sky lighting band | 1.2mm FRP, double layer |
Sliding door | sandwich panel door |
Roof drainage system | |
Gutter | 0.5mm color steel plate |
Rainspout pipes | Φ110 PVC pipe |
1 | Location | city |
2 | Size(length*width*height) | m* m* m |
3 | Wind speed (max.) | km/h |
4 | Snow load (max.) | |
5 | Anti-earthquake | level |
6 | Brick wall needed or not?(If yes) | 1.2m high or 1.5m high |
7 | Thermal insulation | |
8 | Door quantity & size | units, (width)m* (height)m |
9 | Window quantity & size | units, (width)m* (height)m |
10 | Crane needed or not ?(If yes) | units, max lifting weight tons, max. lifting height m |
11 | Mezzanine needed or not ? (If yes) | layers, (height)m, weight bearing Kg/m2 |
FAQ |