Structur Part |
Part |
Specification |
Main Steel Frame Frame |
Column and beam |
Q235B, Q355B |
End-wall column |
Q235B, Q355B |
Process |
Welding |
Automatic submerged arc welding |
Rust removal |
Sandblasting |
Surface finish |
Alkyd paint or galvanized |
Intensive bolt |
M20-M30,Grade 10.9s |
Supporting Sys |
Angle bracing
Roof bracing
X-bracing between columns
Tie rod
Roof bar Purlin |
Angle iron L50x5
φ20,φ25Round Steel
φ20,φ25Round Steel
φ12,Round Steel
32 mm diameter Steel Pipe C/Z100-300, Q235,galvanized |
Roof Sys |
Roofing material
Skylight panel Gutter
PVC downspout |
0.4-0.6mm steel plateService life 20 years
1.5mm V840/N760 Galvanized sheet or Stainless steel 150,160 |
Wall Sys |
Wall material Door
Window |
0.5mm,0.6mm steel plateService life 20 years
Electric rolling door
Aluminum alloy or plastic steel window |
Others |
Crane
Steel platform
Parapet (wall) |
Can be customized
Can be customized
Can be customized |
Design Capability
Five Points Should Be Paid Attention To In The Design Of Steel Structure Workshop:
1. Thermal Insulation and Fire Prevention of Steel
Steel has high thermal conductivity, and its thermal conductivity is 50w (m.ºC), so when the ambient temperature of the steel structure reaches above 150ºC, it must be designed for heat insulation and fire protection.
2. Roof Support System and Roof Design
At present, there are two commonly used steel structure roofing methods on the market: Rigid roof: double-layer color profiled steel plate with insulation cotton; Composite flexible roof: composed of roof color steel plate inner panel, gas barrier layer, insulation layer, coil Material waterproof layer.
3. Setting of Temperature Expansion Joint
The temperature change will cause the deformation of the steel structure factory building, which will cause the structure to produce temperature stress. When the plane scale of the factory building is large, in order to avoid large temperature stress, temperature expansion joints should be set in the vertical and horizontal directions of the factory building.
4. Anti-rust Treatment
The surface of the steel structure will corrode when exposed directly to the atmosphere. Generally, anti-corrosion primers and topcoats are often used for the anticorrosion of steel structures, and the number and thickness of coating layers are often determined according to their use environment and coating properties.
5. Facade Design
The facade of the steel structure factory building is mainly determined by the process layout. Under the requirements of the process, the facade is concise and magnificent, while the nodes are as simple and unified as possible.
Building Material
Product Production
Project Cases
Steel Structure Buildings Supply:
Warehouse, Workshop, Factory, Hangar, Garage, Hospital, Shed, Hall, Supermarket, Gym, Office, Hotel, Shopping mall, Exhibition hall etc.
Company Profile
CONTACT US FOR A QUOTE
Do you have design drawings? |
If not, answer the following questions, designed for you |
Location (Specific city) |
|
Application |
|
Size |
_____(m)L*_____(m)W*_____(m)H |
Crane |
_____(h) Maximum daily working time
_____(t) Lifting capacity
_____(m) Operating height |
Maximum wind speed |
_____km/h (Indicate the judging criteria) |
Maximum snowfall |
_____mm/24h (Indicate the judging criteria) |
Magnitude of earthquake |
_____Level |
Is it built near the sea? |
|
Door and Window |
Quantity: _____(unit)
Size: ____(m)L*_____(m)W*_____(m)H |
Roof and Wall panels |
Quantity: Single/double layer
Material: Foam/Rockwool/Polyurethane sandwich board
Thickness: According to customer's requirement |
Thermal Insulation |
According to customer's requirement |
Lighting Mode |
Daylighting belt/Daylighting tube/Fixed window |
Ventilation |
Roof ventilation/Point ventilation/Turbine ventilation |
Brick Wall |
1.2m/1.5m/other |
Other |
Materials that are not allowed to be imported into the country |
Q&A
1. How long does it take to build a steel structure?
Since the main products of the factory structural parts have been prefabricated in the factory, the production cycle is less than 30 days and then shipped to the site for installation. Installation times usually depend on the size of the plant and the number of workers needed.
2. Will installation services be provided?
We will provide detailed installation drawings and 3D structure drawings for reference before the goods arrive at the destination. Online support will also be available. If an engineer or installation team is required, the cost will need to be negotiated.
3. Can the steel structure be relocated twice?
The modular, prefabricated and lightweight features of our structures ensure their durability but ease of relocation. The structure can be disassembled and reassembled on a new site without any complications.
4. Do you offer design?
Our company has more than ten years of professional structural engineers and designers, can comprehensively consider your needs and the environment of the region, for each component of strict one-to-one calculation. Make sure every design is done on a secure basis and saves you money.
5. Is your house custom-built?
Our control over all aspects of the building ensures that we can customise the structure to meet your needs and wishes. Therefore, we can customize all aspects, including model, design, manufacturing; As a result, our high quality steel construction is customizable.