Customization: | Available |
---|---|
Connection Form: | Bolt Connection |
Certification: | CE, ISO |
Still deciding? Get samples of US$ 20/Square Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Details
Reasons to Use Steel Structure
|
|
Cost-effective
|
Compared to other framing materials, structural steel brings greater value to a project in terms of initial cost as well as reduces costs in other areas.
|
Accelerated schedules
|
Structural steel is fabricated off-site while preliminary site preparation and foundation work are being performed. It is then brought to the site and rapidly erected, accelerating the overall project schedule.
|
Quality
|
Structural steel is fabricated off-site under controlled conditions, ensuring a high-quality product and reducing the number of costly fixes at the job site.
|
Green
|
Today's modern steel mills produce steel containing an average of 90% recycled material. At the end of a building's life cycle, 100% of the steel frame can be recycled
|
Safety
|
By using prefabricated building solutions construction time is significantly shorter, meaning less time and fewer reasons for accidents to occur.
|
Future Adaptability
|
Steel buildings and frames are easily expanded either upwards or to any side. Because steel is extremely strong for its weight it can support the added weight of new stories.
|
FAQ
1. You are manufacture factory or trading company?
We are manufacture factory. And you are welcomed to visit us at any time. The quality control flow and sales team will show you our professionalism. Also you will can get best and most competitive price after visiting us.
2. Can you send engineers or whole team to install my project?
We will supply detailed installation drawings and video for free. Certainly we also can send engineers as installation director or a team upon request.
3. Do you accept container loading inspection?
You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
4. Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. we can design complex industrial building like office building, super marker, auto dealer shop, shipping mall, hotel, department and so on.
5. What is the delivery time?
Delivery time depends on order quantities. In general the delivery time to nearest seaport in China will be 30-45 days after receiving deposit.