* We have over 15+ years in the construction of building materials, pre-engineered steel buildings.
* Offer a much cheaper price with advice to help you control and balance the budget with the design of the building,
construction materials, minimizing the cost of delivery.
* Professional because of many experiences in designing buildings - manufacturing many construction works.
Main Component
Building Accessories
One-stop Service
DRYC provides customers with systematic integrated house solutions covering the whole process from project planning, scheme and construction drawing design, Purchase and producing, transporting and installing to project management.
Company Profile
Dingrui Yongcheng Steel Structure Co., Ltd. was established in 2014, integrating the design, manufacture and installation of steel structures. Our factory covers an area of more than 30,000 square meters, with a workshop area of 20,000 square meters. In the factory, there are 6 advanced production lines of H-beam, which can process up to 2,500 tons of new building materials per month. We also have the most advanced new-type building material equipment and intelligent new-type building material processing line in China. This intelligent production line can independently complete a series of processes such as straight strip division, transmission, assembly, welding, flipping, and straightening of steel, and truly realize production automation and mechanization.
FAQ
1. What are your main products?
A: Our main products are container houses, steel structure plants, steel structure warehouses, light steel structure villas, steel structure poultry farms and so on.
2. What kind of building drawings will the factory provide?
A: Plan, elevation, section, foundation, installation.
3. Can you offer designing service?
A:Of course, we have professional designers who can design a complete solution according to your requirements. You can also provide the design drawings and we can further deepen them.
4.What's your delivery time?
A:Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45 days after receiving deposit. Large order delivery time should be arranged separately.
5.How about the payment?
A: All payment methods are acceptable. We prefer to 30% down payment by T/T, 70% balance before shipment.
We have the most professional designers and experienced trade personnel, if you are interested in our products, you can contact us.