Customization: | Available |
---|---|
Certification: | CE, ISO |
Roof and Wall Panel: | Sandwich Panel, Color Steel Plate |
Still deciding? Get samples of US$ 40/Square Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Steel framework (Q235B,Q355B) |
1.Steel beam 2.Steel column 3.Bracing 4.H cross-section steel,box cross-section steel,round pipe,round steel,L steel,etc. |
|||
Wall and roof
|
1.Single steel sheet 0.36mm-0.6mm thick 2.Sandwich panel with EP,PU,glass wool and rock wool(50-120mm) |
|||
Door
|
1.Roller door 2.Sliding door and sidewall door 3.Steel sheet, sandwich panel or aluminum-alloy. 4.According to your requirements |
|||
Window
|
1.Sliding window 2.Plastic-steel frame or aluminum frame 3.According to your requirements |
|||
Gutter
|
1.Aluminum-zinc steel sheet 2.Stainless sheet |
|||
Downpipe
|
1.PVC 2.Stainless pipe |
|||
Skylight panel
|
FRP,1.5mm,2.0mm,2.5mm,according to your requirements
|
|||
Ventilation
|
1.Turbine vent 2.Ridge vent 3.According to your requirements |
|||
Other materials
|
Self-screwing tapping,bolt,nut etc.
|
Junction Detail
Cases of Project
Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components,
and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.
Company ProfileHow To Get Quotation
The following question we need to know before making the price. Just feel free to fill what you know.
1 | Location (where will be built?) | _____country, _____ city |
2 | Size: length*width*height | _____mm*_____mm*_____mm |
3 | Wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
4 | Snow load (max. snow height) | _____kn/m2, _____mm |
5 | Anti-earthquake | _____level |
6 | Brickwall needed or not | If yes, 1.2m high or 1.5m high |
7 | Thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former |
8 | Door quantity & size | _____units, _____(width)mm*_____(height)mm |
9 | Window quanity & size | _____units, _____(width)mm*_____(height)mm |
10 | Crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |