Low-Cost Steel Structure Construction Arch Bridge Made in China

Product Details
Customization: Available
After-sales Service: Full-Service, Free Expert Consultation, Guarantee
Scale: Large Bridge
Still deciding? Get samples of US$ 100/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
R&D Capabilities
The supplier has 5 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (24)
  • Low-Cost Steel Structure Construction Arch Bridge Made in China
  • Low-Cost Steel Structure Construction Arch Bridge Made in China
  • Low-Cost Steel Structure Construction Arch Bridge Made in China
  • Low-Cost Steel Structure Construction Arch Bridge Made in China
  • Low-Cost Steel Structure Construction Arch Bridge Made in China
  • Low-Cost Steel Structure Construction Arch Bridge Made in China
Find Similar Products

Basic Info.

Model NO.
DRYC-2951
Usage
Footbridge, Highway Bridge, Over Water Bridge, Railway Bridge, Viaduct
Material
Steel
Secondary Frame
Tie Bar, Bracing,Diagonal Rod for Bridge
Pre-Assembly
Pre-Asembly in Our Factory
Main Frame
H Beam and Column,Lower Chord Brace
Surface Treatment
Painted
Lead Time
45-60 Days
Transport Package
Pallet+Container
Specification
Customized
Trademark
DRYC
Origin
Qingdao
HS Code
7308100000
Production Capacity
30, 000 Tons a Year

Packaging & Delivery

Package Size
1200.00cm * 200.00cm * 250.00cm
Package Gross Weight
20000.000kg
Lead Time
15 days (1 - 2000 Tons)
To be negotiated ( > 2000 Tons)

Product Description

Specification of the bridge
 
Product Prefab Steel Structure Bridge
Material Mild Steel; Stainless Steel
Coating Spray Painting; Galvanization; Powder Coated
Color Blue; Green; Darkgray; Client's Request
Steel code Q235-B; Q345-B; Stainless steel
Fabrication Advanced Automatic Welding Machines
Quality control GB/T19001-2000----ISO9001:2000
Advantages 1. Stable and Aesthetic
2. The structure is durable for 50years
3. Fast and easy to install
4. Extensive Applications: Storage, Warehouse, Exhibition Hall, Terminal Building, Stadium, Theater, Special-shaped Buildings, etc
5. High anti-rust performance
6. Flexible composition: Doors and Day-lighting roof could be  installed at any position

As an outstanding representative of modern bridge construction, steel structure bridge is unique in many bridge types by virtue of its excellent performance.
The steel has ultra-high strength and toughness, which makes the steel structure bridge can easily cross various obstacles such as rivers, lakes and seas, and the span is far more than many traditional bridge structures, which can meet different geographical environments and traffic needs. In terms of carrying capacity, it can withstand a large number of vehicles and additional loads under various adverse weather conditions, providing a safe and stable passage for transportation.
From the durability point of view, after special treatment and protection, steel has good corrosion resistance, can maintain structural integrity for a long time, and greatly reduce maintenance costs and frequency. Moreover, the steel structure bridge has a light weight, and the requirements for the foundation are relatively not so harsh in the infrastructure construction, which can effectively shorten the construction period, reduce the impact on the surrounding environment and the consumption of resources. At the same time, its high degree of industrialization, easy factory prefabrication and on-site rapid installation, accuracy and quality easier to control, further ensure the reliability and stability of the bridge, is a key force to promote the development of modern transportation.
Low-Cost Steel Structure Construction Arch Bridge Made in ChinaLow-Cost Steel Structure Construction Arch Bridge Made in ChinaLow-Cost Steel Structure Construction Arch Bridge Made in ChinaLow-Cost Steel Structure Construction Arch Bridge Made in ChinaLow-Cost Steel Structure Construction Arch Bridge Made in ChinaLow-Cost Steel Structure Construction Arch Bridge Made in China

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now