Basic Info.
Roof and Wall Panel
Sandwich Panel, Color Steel Plate
Bracing
X-Type, V- Type, Angle Pipes
Surface Treatment
Painted or Galvanized
Steel Column and Beam
Welded H Section Steel
Processing Service
Bending, Cutting, Decoiling, Punching, Welding
Project Solution Capability
Graphic Design, 3D Model Design, Tekla Structure
Door
Rolling Doors, Sliding Doors, Double Doors
Column and Purlin
C Section and Z Section
Standard
GB, ASTM, DIN, JIS, AISI, BS
Trademark
Carbon Structural Steel, DRYC
Type of Steel For Building Structure
Residential Wall Structure
Wall Support
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
Transport Package
Standard Packing
Product Description
Modern Prefab Steel Structure Building Prefabricated Warehouse/Workshop/Aircraft Hangar/Office Construction Material
Compared with the traditional concrete structure building system, the light steel structure building projects have a series of advantages, such as large span, low demands of base structure, strong seismic and wind resistance, beautiful appearance, shorter construction cycle, strong corrosion resistance, non-polluted, low maintenance costs and so on. Therefore it is more and more popular with the customers. It is mainly used for large-span structures, workshops, warehouses, office buildings, large
supermarkets, logistics warehouses, showrooms, hangar, etc.
ITEMS | SPECIFICATION |
Main Steel Frame | Colum | Q235,Q355 Welded H Section Steel |
Beam | Q235,Q355 Welded H Section Steel |
Secondary Frame | Purlin | Q235 C and Z purlin |
Knee Brace | Q235 Angle Steel |
Tie Rod | Q235 Circular Steel Pipe |
Brace | Q235 Round Bar |
Vertical and Horizontal support | Q235 Angle Steel, Round Bar or Steel Pipe |
Maintenance System | Roof System | Roof Panel (EPS/Fiber Glass Wool/Rock Wool/PU Sandwich Panel or Steel Sheet Cover) and Accessories |
Wall System | Wall Panel (Sandwich Panel or Corrugated Steel Sheet |
Window System | Aluminum Alloy Window/ PVC Window/Skylight |
Door System | Sliding Sandwich Panel Door/Rolling Metal Door/PVC Door |
Others | PVC Rainspout,Gutter etc |
Wind Resisitance Grace | 11 Grades |
Earthquake-resistance | 7 Grades |
Structure life span | Up to 50 years |
Temperature | Suitable temperature -50ºC~+50ºC |
Certification | CE, SGS, ISO9001:2008, ISO 14001:2004 |
Finishing Options | Vast array of colors and textures available |
Paint Options | Alkyd painting, two primary painting, two finish painting(gray paint, red paint, white paint, epoxy zinc etc.) or Galvanized. |
Main ComponentsMaintenance Materials Color Plate Polyurethane sandwich board Rock wool sandwich board Truss floor plate FRP Lighting Tile Stainless steel gutterDesign Capability 1.COST-EFFICIENCY:Faster design/build process / Lowered labor costs / Reduced maintenance costs
2.DURABILITY:Steel is resistant to many of the typical threats experienced by wood, such as rot, mold, mildew, pests and fire.
3.CLEAR SPAN-ABILITY:The less structural obstructions required for your building the more square footage you can put to work for your company's bottom line.
4.FLEXIBLE DESIGN OPTIONS: Your warehouse can also be designed to incorporate a mix of clear span spaces and traditional office spaces or living spaces.
5.ECO-FRIENDLY:Cool metal roofs / Vapor barriers / Vapor barriers / Solar panels
Junction Detail
Cases of Project
Installation of Steel Structure Building1.Foundation construction (pre-embedded anchor bolts), detail need to according to the foundation construction drawing.
2.Column installation
One worker commands truck crane how to move, 3 ~ 4 workers cooperate with truck crane to install the steel column, put column to anchor bolt location.
3.Beam installation
After completing the installation of adjacent two steel column, then main beam begin to install.
4.Installing roof & wall purlin
The roof and wall purlin will be installed after finishing column and beam. Bolting the purlin on the main structure.
5.Fixing wall and roof sheet
To fix the wall sheet on wall purlin by self-tapping screw; then fix the roof sheet.
6.Fixing the cover
To install the cover on the corner, eave, window and door opening.
7.Install windows and doors.Packing and Transportation
Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components,
and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.
Company Profile
How To Get Quotation
The following question we need to know before making the price. Just feel free to fill what you know.
1. Location (Where will be built): __Country __area
2. Size ( length* width* height ): __ m*__ m*__ m*
3. Wind speed: __KM/H
4. Snow load: __KG/m²
5. Anti-earthquake: __level
6. Brickwall need or not? If yes, 1.2m high or 1.5m high?
7. Thermal insulation: If yes, fiberglass wool, rock wool, PU sandwich panels will be suggested; if not, the metal steels will be ok. The cost of the latter will be much lower than that of the former.
8. Door quantity & size: __units __(width)m __(height)m
9. Window quantity & size: __units __(width)m __(height)m
10. Crane needed or not: If yes, __units, crane max lift height __m, max lift capacity __tons.
FAQ 1.What's the quality grade of the steel structure components?
Reply: Q355 is used for main steel structure, Q235 is used for secondary steel structure.
2.How about the delivery time?
Reply: Usually, about 30 days after the order confirmed, also depends on the fabrication quantity.
3.How about the derust grade?
Reply: Ball blasting Sa 2.5 on main steel structure, manual derust St2.0 on secondary steel structure.
4.What kind panel used for the roof and wall?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation, sound insulation. Common sandwich materials are EPS, glass wool and PU.
5.How to install it?
Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if needed.
Please let us know the following information, our experienced design team will design the steel poultry house for you, we will give you an satisfactory drawing.
Address:
Rm905 Jinshi building, 8 Qinling Road, Qingdao, Shandong, China
Business Type:
Manufacturer/Factory
Business Range:
Agriculture & Food, Construction & Decoration, Electrical & Electronics, Industrial Equipment & Components, Instruments & Meters, Security & Protection, Service, Textile, Tools & Hardware
Management System Certification:
ISO 9001, ISO 14001
Company Introduction:
Dingrui Yongcheng Steel Structure Co., Ltd is a large-scale company which specializes in designing, manufacturing and installing all kinds of steel structure projects.
Established in 2014, DRYC has the most advanced equipment and the first intelligent state-of-the-art production line in China which is capable of completing a series of processes such as cutting, transmission, assembly, welding, flipping, and correction. The monthly output is more than 2000tons.
DRYC keeps pace with the times by incorporating modern management methods into all aspects of enterprise and construction management, which has LED to a steady improvement in quality and standardized management of the company. The company has obtained certifications such as GB/T 19001-2016/ISO 9001: 2015, GB/T24001-2016 / ISO 14001-2015.
With over 10 years of experience in the industry, we have built a reputation for delivering high-quality products that meet and exceed our clients′ expectations. Our skilled team of engineers and designers are equipped to handle any project, no matter the size or complexity.
In 2022, Dingrui Yongcheng (Qingdao) International Trade Co., Ltd established in the beautiful costal city - Qingdao, Shandong. With a morality-based people-oriented global mind, DRYC is committed to promoting steel structure products to the world. At present, our production has been exported to many countries and regions and got high praised.
We are not the biggest, we are the best.